Owner: PTT
EPC: Offshore Oil Engineering Co., Ltd
Operating vessel: Lanjiang
Completion date: December 2015
Construction period: 96 days
ZAWTIKA 1B project is located in the 300km sea area in the south of Yangon, Myanmar. The operating water depth is 140-150m. The total length of submarine pipeline is about 60km, and the number of nodes is about 5000. In this project, CANUSA heat shrinkable sleeve (HSS) and high-density polyurethane foam (HDPU Foam) are used for anti-corrosion protection of subsea pipeline nodes. Oriental Construction and PIH worked together to complete the task successfully.
Focus:
● This project is also the first international EPCI general contracting project obtained by Offshore Oil Engineering Co., Ltd
● It marks the extension of Oriental construction technology capability from offshore to offshore